Hi,
Soon to lay 500mm sq tiles onto screeded hall/kitchen floor 25m2. Hall floor has vinyl tiles stuck to screed. Should I remove vinyl and adhesive then prime and slc or slc over adhesive? There is a 5mm dip just in front of the front door so need to level that anyway.
The screed down now...