Evening fellas.
Laid 120kg of Ultra Level It Oneself Levelling Compound at an average of 5mm (to cover UFH). This was poured onto 2 week old latex (same stuff) that levelled out the original screed floor. Prep' has been thorough in the 2 part application, i.e, SBR on original floor, SBR on top...