B
bearwithme
eve folks. went to look at a storage cupboard in a nursing home yesterday. mainly with a view to plastering it. before leaving the gaffer asked if i'd be up for sorting the floor out and then tiling. needs to be raised and levelled about 35mm before tiling. what would be the best way to tackle this, sand and cement or could anyone recommend a levelling compound to do the job. cupboard measures 4m x 1m .im in brum and have a ctd nearby, thanks.