hi all,
i have a big job in the pipeline 200m floor tiles in restraunt,the tiles are ceramic 300x300
not sure yet what condition floor is in but was wondering what would be a good
competative price for this (not including materials) and what would be a realistic time to
complete.
i have a big job in the pipeline 200m floor tiles in restraunt,the tiles are ceramic 300x300
not sure yet what condition floor is in but was wondering what would be a good
competative price for this (not including materials) and what would be a realistic time to
complete.