Does anyone have any idea on the drying time for a 70mm 4:1 screed with PP fibres? I know that the BS is 1 day per mm up to 50mm and then 2days for everything above 2mm but the info I have says that the fibres reducevthe drying time but dont say by how much.
The builder hasn't a clue, we asked him to use a fast drying screed as the new floor runs up against an existing one making the whole room 52m. I tiled the old area yesterday so that at least most of the new kitchen can be installed otherwise it would be weeks?
Any info gratefully accepted
The builder hasn't a clue, we asked him to use a fast drying screed as the new floor runs up against an existing one making the whole room 52m. I tiled the old area yesterday so that at least most of the new kitchen can be installed otherwise it would be weeks?