We have our bathroom renovated and contracted an experienced tiler to do the tiling job. We removed 2 of the tiles after more than 48 hours as they had misaligned corners. We noticed there seem to be limited area were the tile BAL ready mixed adhesive has actually bonded to the green plasterboard , as seen in the pictures. We are now quite concerned and don't know what is best to do next...
Is this even a reason for concern for all the other installed tiles ? As the tiling job is around 80% completed, is it OK to carry on with the same adhesive ?
Job details: 10mm thick, 300x600 ceramic tiles. Installed by the professional tiler using 7mm notched trowel and BAL white Star Plus tubbed ready mixed adhesive. Resulting gap between plasterboard and tile is around 4-5mm. Backing substrate is green plasterboard except for shower-over-bath area where there are Wedi boards.
Is this even a reason for concern for all the other installed tiles ? As the tiling job is around 80% completed, is it OK to carry on with the same adhesive ?
Job details: 10mm thick, 300x600 ceramic tiles. Installed by the professional tiler using 7mm notched trowel and BAL white Star Plus tubbed ready mixed adhesive. Resulting gap between plasterboard and tile is around 4-5mm. Backing substrate is green plasterboard except for shower-over-bath area where there are Wedi boards.
Last edited: