Hi all im quickly becoming addicted to this site its fantastic for getting bits of advice and for seeing what other tilers are up to. Im looking for a bit ofprobabl advice really im on a job at the minute a kitcen and bathroom floor both with underfloor heating. the floors have been screeded with a latex levelling by the builder i'd say probably about 20-25mm. he has asked me to tile these floors and ive told him about the need for drying which he is ok about but he has asked if he turns on the ufh to aid drying time will that be ok? i've said i don't think he should and am wondering if i have done the right thing or can this be done? I know about using Bal green screed adhesive but given the price per bag i dont think he fancies that.
Also how long after tiling can the ufh be turned on and why?
Thanks in advance
Adam
Also how long after tiling can the ufh be turned on and why?
Thanks in advance
Adam