M
mna78
Hi all, just joined, site looks great with lots of info on it.
Right anyway, I have a job which I'd like some advice on:
Shower Leak has caused damage to plasterboard, I need to remove mouldy plasterboard and tiles (after fixing leak).
Now I'd normally put up new plasterboard, scree/skim and then tile a couple of weeks later, but this all needs to be done in a day. I can't just seal the plasterboard as the section being replaced would be shallower then the existing area by some 3-4mm
So I know of hardibacker board, would this be suitable? do I put it ontop of plasterboard? any other ideas?
Cheers
Mark
Right anyway, I have a job which I'd like some advice on:
Shower Leak has caused damage to plasterboard, I need to remove mouldy plasterboard and tiles (after fixing leak).
Now I'd normally put up new plasterboard, scree/skim and then tile a couple of weeks later, but this all needs to be done in a day. I can't just seal the plasterboard as the section being replaced would be shallower then the existing area by some 3-4mm
So I know of hardibacker board, would this be suitable? do I put it ontop of plasterboard? any other ideas?
Cheers
Mark