J
jaykay
hi i was hopping someone may be able to help me.i am having a conservatory built in 2 weeks time.
i want to install ufh matt and would like to know what level to ask the installer to leave concrete
base to allow for the matting etc so the floor tiles just finish below back door bottom.
also how long should i leave concrete base to cure befor starting installation of heating matt.
hope these questions makes sense and thanks for any help in advance.
i live in suffolk
i want to install ufh matt and would like to know what level to ask the installer to leave concrete
base to allow for the matting etc so the floor tiles just finish below back door bottom.
also how long should i leave concrete base to cure befor starting installation of heating matt.
hope these questions makes sense and thanks for any help in advance.
i live in suffolk