Hi, am pricing a big job for a pub at the moment which has ladies and gents tiolets plus a kitchen which all require alto trim normally I don't charge for this because i put it on with tile adhesive as im putting last tile on which is quicker than cutting the bottom tile but this job is going to need about 100m2 of the stuff it was only when another tiler told me he charges for putting these on it entered my mine. So if anyone thinks I should charge for this how much????