gemmatrent
Hi - losing sleep over this so appreciate some advise.
My builder rushed tiling the kitchen floor, and laid tiles 2 weeks after screed was poured in. Only now do I find out he should wait for screed to dry. It has been 2.5 months now, and so far the tiles (40x60cm, porcelain) seem ok (no cracking or buckling).
Does that mean I got lucky and the tiles will be ok seeing its already 2.5 months?
Or can problems like tiles buckling, cracking still happen later on? When is the "safe" period when I can stop worrying?!
THANK YOU!!!!!!
My builder rushed tiling the kitchen floor, and laid tiles 2 weeks after screed was poured in. Only now do I find out he should wait for screed to dry. It has been 2.5 months now, and so far the tiles (40x60cm, porcelain) seem ok (no cracking or buckling).
Does that mean I got lucky and the tiles will be ok seeing its already 2.5 months?
Or can problems like tiles buckling, cracking still happen later on? When is the "safe" period when I can stop worrying?!