We are looking for flooring for our new kitchen, lounge and hallway and would like to use LVT throughout. The vast majority will be floorboards but we have had underfloor heating put in a relatively small area of the kitchen and lounge which was screeded with 100mm depth about 2 weeks ago. We have been advised that any LVT/Amtico type flooring will require 5 months before it can be installed due to the screeding needing to dry. Our builder is trying to get us to install porcelain but we would rather LVT as it is warmer on the feet and cheaper, but we don't want to wait so long for the flooring to be laid as it will delay the rest of the project finishing - and the builder obviously doesn't want to wait either. Can anyone advise on what we should do here - we don't want to make a mistake and for the flooring to come up in a few months time.
 

Ajax123

TF
Esteemed
Arms
932
1,213
Lincolnshire
There are lots of options depending on the screed type. Liquid DPMs, fast track moisture suppressants, uncoupling membranes, force dry techniques so it really depends on the screed type as to what you can do.
 

Reply to Amtico - but can we wait 5 months for floor to dry? in the America Tile Forum / Advice Board area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

L
Hi guys, I've just installed Weberfloor flex in a small area 1m2 @35-40mm depth in one pour...
Replies
0
Views
854
leoder
L
Hi all I’m so glad to have stumbled upon this forum, which seems to be a treasure trove of...
Replies
5
Views
3K
gamer1
G
Hello, Just joined the forum and am hoping to get some advice on a project. I live in San...
Replies
2
Views
4K
We had a water underfloor heating installed and tiled over. 3 months later we noticed many tiles...
Replies
7
Views
3K
Amethsyt
A
Hi All, I'm new to the forum and not in the trade, so please excuse my ignorance. I'm looking...
Replies
1
Views
4K
MiriamT
M

USA Tile Forum Popular

America Tile Advice Trending

Advertisement

Thread starter

Joined
Location
ha88ju
What member type are you?
  1. Homeowner

Thread Information

Title
Amtico - but can we wait 5 months for floor to dry?
Prefix
N/A
Forum
America Tile Forum / Advice Board
Start date
Last reply date
Replies
7

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 6.0%
  • Kerakoll

    Votes: 14 9.3%
  • Ardex

    Votes: 11 7.3%
  • Mapei

    Votes: 44 29.1%
  • Ultra Tile

    Votes: 18 11.9%
  • BAL

    Votes: 36 23.8%
  • Wedi

    Votes: 3 2.0%
  • Benfer

    Votes: 2 1.3%
  • Tilemaster

    Votes: 21 13.9%
  • Weber

    Votes: 18 11.9%
  • Other (any other brand not listed)

    Votes: 16 10.6%
  • Nicobond

    Votes: 7 4.6%
  • Norcros

    Votes: 3 2.0%
  • Kelmore

    Votes: 4 2.6%
Top