Hi All,

I'm currently looking at putting down a anhydrite screed and then tiling on it and putting down somw timber flooring. the screed is made by Bardons and is called Highflow S; my question is what to put on top of this screed; I've been advised to use a primer and cementacous tile adhesive OR to use a acrylic tile adhesive, any advice would be grratefully received. PS the tiles are ceramic and 300mm square.

cheers,

Andy
 
D

DHTiling

Ok..

Well this wet UFH will need to be commissioned before any tiling can commence.. this can start usually as early as 7 days from the pour...

Now this screed will need to be dry enough to tile before you tile it and by using the wet UFH you can force dry the screed..

Turn on the heating at ambient (approx 20 degrees C) after minimum 7 days. Leave at this temperature for 3 days. Then increase the temperature by maximum 5 degrees C per day up to a maximum of 55 degrees C. Leave at this temperature for 7 days then reduce by 5 degrees per day down to its normal operating temperature and leave at this temperature for as long as you like but normally for 3 or 4 days. Then switch off for three days before moisture testing to determine if it is dry. The effect of force drying with the heating must be accompanied by good ventilation i.e. plenty of draught from open windows and doors. Alternatively Dehumidifiers can be used but they need to be man enough for the job as heating the screed will drive ou moisture quite quickly. All temperatures are flow temperatures and not surface temperatures.
The bardon high flow screed is not a low laitance one and thus will need to be removed prior to tiling.. this can be done with either a scarifier or a floor sander.. The laitance is a friable surface that is left on the top as a result of the pour and levelling process from the screeders.. look as it as a creamy residue that dries as a crust on the surface and needs to be removed ..1: to allow the screed to dry quicker and fully and ...2 : to aid in the priming and adhesion of the adhesive.

The floor needs to be around 75% RH before you can tile with a cement based adhesive and 85% RH with a Gypsum based adhesive.. and a method of testing for the content of moisture is the use of a Hair-hygrometer.
 

Reply to Anhydrite Screed and tiling in the UK Tiling Forum area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

    • Like
I'm having a nightmare trying to establish product info from distributors. For example...
Replies
0
Views
907
    • Like
Hi all, My 1st post and just wanting some help/reassurance on a DIY bathroom refurb. I’m...
Replies
4
Views
2K
Just seen Rocatex on uHeat.co.uk and thought hmmm that's a new one on me. Anybody used it yet...
Replies
3
Views
1K
hello new here but wished i had found and asked before screed and ufh down but here goes. We...
Replies
12
Views
2K
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
1K

Trending UK Tiling Threads

UK Tiling Forum Popular

Please visit our sponsor websites, they keep the forum free to use!

Advertisement

Thread Information

Title
Anhydrite Screed and tiling
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
7

Which tile adhesive brand did you use most this year?

  • Palace

  • Kerakoll

  • Ardex

  • Mapei

  • Ultra Tile

  • BAL

  • Wedi

  • Benfer

  • Tilemaster

  • Weber

  • Other (any other brand not listed)

  • Nicobond

  • Norcros


Results are only viewable after voting.

You're browsing the UK Tiling Forum category on TilersForums.com, the tile advice website no matter which country you reside. Our UK based online tiling forum has 48,000 members and started out in 2006.

Top