D
Dougs Third Go
got a wetroom to start on monday and the former is flush with the new chipboard floor. Got 6mm insulation boards and ufh +slc to go on top of chipboard that will leave me something like a 12mm step down into the former before I even start to tile. Obviously I'd like the former flush with the top of the slc,but only way I can see to do that is to take 12mm off the bottom of the wall boards that are sat on top of the former, take the former out and relay it on top of a 12mm ply sheet. Either that way or envelope cut 10mm boards over the former....suggestions please