R
rj1884
Good afternoon.
I went to look at a job yesterday with one wall being studded out. Most of the wall is plasterboard and the rest is hardie backer in the shower area. The plasterers then plastered the plasterboard and stopped where it met the backer board meaning they have now created a lip from the backer board to the plaster. I obviously would just waterproof the shower area and tile but this lip may now cause problems as I don't want to bed the tiles out in the shower area. Can backer board be skimmed to bring it flush with the existing plaster. I know this isn't par for the course but would it cause any problems doing this.
Sorry for the long winded explanation. Thanks in advance.
I went to look at a job yesterday with one wall being studded out. Most of the wall is plasterboard and the rest is hardie backer in the shower area. The plasterers then plastered the plasterboard and stopped where it met the backer board meaning they have now created a lip from the backer board to the plaster. I obviously would just waterproof the shower area and tile but this lip may now cause problems as I don't want to bed the tiles out in the shower area. Can backer board be skimmed to bring it flush with the existing plaster. I know this isn't par for the course but would it cause any problems doing this.
Sorry for the long winded explanation. Thanks in advance.