C
coco3107
Hi guys been reading the forum for a couple of weeks, never realised there was so much to tiling but it has been a great learning curve thanks!
I am doing a bathroom in a flat I own which is chipboad on joists screwed down, then as you guys seem to recomend, 12mm wbp ply at 100mm centres screwed and glued, then the primer supplied with the underfloor heating wire screeded in using 2 part fastlex as recommended by Bal technical. The problem is I mixed it as per the instructions and laid it with a flat trowel to screed the wire in, but 5 hours later it is still not dry? Should I be worrying? Thanks in advance Colin.
:huh2:
I am doing a bathroom in a flat I own which is chipboad on joists screwed down, then as you guys seem to recomend, 12mm wbp ply at 100mm centres screwed and glued, then the primer supplied with the underfloor heating wire screeded in using 2 part fastlex as recommended by Bal technical. The problem is I mixed it as per the instructions and laid it with a flat trowel to screed the wire in, but 5 hours later it is still not dry? Should I be worrying? Thanks in advance Colin.
:huh2: