C
Canyondust
Hi.
I am looking to use a coloured BAL sealant (Micromax) to finish off my wet room. Within the spec sheet it states '
(a) Do not use shower for at least 2 weeks after completion of
grouting – BS 5385😛art 4'
And in another section it mentions a minimum of 7 days to use the shower.
Walls grouted with BAL Micromax 2
Floors with Mapei Ultracolour Plus
All tiles ceramic, some mozaic on wet room tray and feature in the shower
From my perspective having to wait 2 weeks to use the shower will be a little frustrating.
Your thoughts?
Regards
James
I am looking to use a coloured BAL sealant (Micromax) to finish off my wet room. Within the spec sheet it states '
(a) Do not use shower for at least 2 weeks after completion of
grouting – BS 5385😛art 4'
And in another section it mentions a minimum of 7 days to use the shower.
Walls grouted with BAL Micromax 2
Floors with Mapei Ultracolour Plus
All tiles ceramic, some mozaic on wet room tray and feature in the shower
From my perspective having to wait 2 weeks to use the shower will be a little frustrating.
Your thoughts?
Regards
James