S
Sanke
Doing a shower cubicle. Put up hardie backer today & sealed all joints with scrim & rapid set. Tomorrow I was going to apply tanking then possibly install shower tray on legs soliconing in between. Looking at a few vids for tanking they show bringing waterproof mat to top of tray. I was going to take to floor. Which is the right or best way ?