P
purleyite
I recently priced up a job for two bathroom floors, one 2.5sqm, the second 3sqm. Both seemed fairly basic jobs, pretty much all straight cuts onto a concrete floor. I priced this at £xx for both. im in the surrey/hants area. The customer said he would get the adhesive, grout and tiles as he knew someone who'd get them at trade price.
He then came back to to me and said he'd been quoted £xx plus they'd get adhesive and grout.
I thought i quoted a reasonable price for 2/3 days work. Did i over price this??
Im still quite new to this so guess need to learn from my mistakes.
He then came back to to me and said he'd been quoted £xx plus they'd get adhesive and grout.
I thought i quoted a reasonable price for 2/3 days work. Did i over price this??
Im still quite new to this so guess need to learn from my mistakes.
Last edited by a moderator: