E
Enzman
Hi all, i will be doing my 1st job soon in a big bathroom. Shower already tiled and they need to be removed.
How much should you charge for removing old tiles?
Whats best method for removing the old rock hard adhesive on the wall?
If floor needs to be tiled, whats the best option? At the minute its carpet on floor boards. Do i prepare floor with 12mm ply? Do i put anything under the ply first? Is it best to pull out toilet and sink? How do you resolve the height diffrence if floor needs to have ply board plus adhesive and tiles compared to the landing floor. Be a slight step up yes?
Soz for the stupid questions guys...
How much should you charge for removing old tiles?
Whats best method for removing the old rock hard adhesive on the wall?
If floor needs to be tiled, whats the best option? At the minute its carpet on floor boards. Do i prepare floor with 12mm ply? Do i put anything under the ply first? Is it best to pull out toilet and sink? How do you resolve the height diffrence if floor needs to have ply board plus adhesive and tiles compared to the landing floor. Be a slight step up yes?
Soz for the stupid questions guys...