Hi everyone
Got a bathroom job both the floor and walls. On one wall there is the toilet and sink which are to be removed. Only trouble is Im not sure which order I should tackle it. Do I start with the floor directly under the toilet or the wall behind toilet and sink or does it not matter - thinking about the cuts near the floor? Basically I need to tile behind toilet and sink and tile the floor under the toilet in one go - and possibly the adjacent wall. If you need any clarification let me know. Thanks.
Best Wishes
Howard
Got a bathroom job both the floor and walls. On one wall there is the toilet and sink which are to be removed. Only trouble is Im not sure which order I should tackle it. Do I start with the floor directly under the toilet or the wall behind toilet and sink or does it not matter - thinking about the cuts near the floor? Basically I need to tile behind toilet and sink and tile the floor under the toilet in one go - and possibly the adjacent wall. If you need any clarification let me know. Thanks.