@ colour Republic. The wall is in its original position but i did have to sink the bath into the wall by 30mm each side(inc tiles). As for the shower cubicle it could not have been any tighter, i had to cut the architrave down to fit it in on width and when I did the ceiling I over boarded the flat but had to rip the angled area down to board straight onto the timber as the screen fits height wise to the mm.
As for the storage shelf's they were fun to tile (my mate loved me for them
). He did an amazing job on them and he sure is a perfectionist I said just put full tiles in (mainly as i was going all the cutting) but he wanted to take the brick bond right through to the back of them. Glad he did as going to put some ambient lighting in them this week.
I dread to think what i would have cost to get someone in to do the job start to finish. It has cost me £2550, but that was with a ridiculous amount of shopping around for parts. Its amazing how much you spend just on little bits like all the plumbing components cost me just under£300 but i did take it all right back including the soil stack.