T
Tilefit
Hi All,
I am tiling a kitchen floor,concrete, and going through to the utility, also concrete, but there is a step, approx. 1 inch, I want to go straight through and not show the step. Does anyone know the best way to do this?? Think it may be too high to put down levelling compound?
Cheers
R
I am tiling a kitchen floor,concrete, and going through to the utility, also concrete, but there is a step, approx. 1 inch, I want to go straight through and not show the step. Does anyone know the best way to do this?? Think it may be too high to put down levelling compound?
Cheers
R