Hi, Hoping for a little advice if possible...
I've just done a repair on a pipe under my downstairs bathroom concrete floor. I've repaired and screeded some of the floor and want to refit a new toilet and sink unit asap. I know I have to wait 6 weeks for the floor to dry before putting down new tiles but is it ok to just place 4 or 5 where the toilet and sink sits so I can start using it again. Most of the newly screed area would still be exposed.
Cheers.
I've just done a repair on a pipe under my downstairs bathroom concrete floor. I've repaired and screeded some of the floor and want to refit a new toilet and sink unit asap. I know I have to wait 6 weeks for the floor to dry before putting down new tiles but is it ok to just place 4 or 5 where the toilet and sink sits so I can start using it again. Most of the newly screed area would still be exposed.