G
Grace'sDad
Finding it a little hard to get back into "work mode" after Xmas and I'm struggling to get my head round this tonight! :mad2:
It's a job for family so I will discount to a point but ignoring that, I have a kitchen floor (asphalt) at 6sqm with a couple of in's and outs. QRock 30x30 from Topps.
Splashbacks inc 6 sockets and one window Qrock 10x10 inc' border tiles with glass inserts.
I'm thinking 3 to 3.5 days at day rate
Watcha fink?
Thanks!
It's a job for family so I will discount to a point but ignoring that, I have a kitchen floor (asphalt) at 6sqm with a couple of in's and outs. QRock 30x30 from Topps.
Splashbacks inc 6 sockets and one window Qrock 10x10 inc' border tiles with glass inserts.
I'm thinking 3 to 3.5 days at day rate
Watcha fink?
Thanks!