According to my readers digest basic guide, 3 parts coarse sand to 1 part cement table then 1 cubic m of sand requires (to the next bag up) 8 x 50 kg. bags of cement.
but if you are buying sand in the big bags which are supposed to be 1 tonne in weight then you will find the volume of sand is (roughly 0.8 x 0.8 x 0.8) only about 0.5 cubic meters