D Derwent999 Dec 3, 2009 #15 :welcome: Hi everyone, How long does Bal SRB Bond take to dry over Old Bitumen adhesive, also concrete and vinyl tiles. Is it Best to give two coats of Bal SBR after the first has dryed. Giving Floor Tiles, Concrete, Old Bitumen adhesive two coat of SBR will it take the floor Tiles better. :8:
:welcome: Hi everyone, How long does Bal SRB Bond take to dry over Old Bitumen adhesive, also concrete and vinyl tiles. Is it Best to give two coats of Bal SBR after the first has dryed. Giving Floor Tiles, Concrete, Old Bitumen adhesive two coat of SBR will it take the floor Tiles better. :8:
D DHTiling Dec 3, 2009 #16 Doesn't need 2 coats...on the old bitumen one i would have mixed the sbr with some adhesive( rapidset ) and made a slurry coat,,gives a better bond
Doesn't need 2 coats...on the old bitumen one i would have mixed the sbr with some adhesive( rapidset ) and made a slurry coat,,gives a better bond