I've done a few quotes since the weekend and got 2 out of 3 - so not bad, as long as they do actually happen. But I want to check this quote I gave today...
10m2 square kitchen floor
concrete floor
slight hump in the middle
some levelling required (3-5mm possibly here & there)
30x30 Granite with black grout.
job is 50 miles from home (but as i'm working near there at the moment distance didn't really matter)
my quote was based on 1 visit to scrape/tidy up the floor, prime, level the areas that needed bringing up. Visit 2 to do most or all of the tiling in 1 day, visit 3 to finish off tiling if needed, seal, grout & seal
I think thats everything.
my quote was £475 inc all materials - levelling, adh, grout & sealer
I don't know why but this 1 has had me itching my head with what to charge, but I think its a realistic price. Any opinions?
I've done a few quotes since the weekend and got 2 out of 3 - so not bad, as long as they do actually happen. But I want to check this quote I gave today...
10m2 square kitchen floor
concrete floor
slight hump in the middle
some levelling required (3-5mm possibly here & there)
30x30 Granite with black grout.
job is 50 miles from home (but as i'm working near there at the moment distance didn't really matter)
my quote was based on 1 visit to scrape/tidy up the floor, prime, level the areas that needed bringing up. Visit 2 to do most or all of the tiling in 1 day, visit 3 to finish off tiling if needed, seal, grout & seal
I think thats everything.
my quote was £475 inc all materials - levelling, adh, grout & sealer