S
Spud
did you allow a 3mm gap between the sheets of ply when they were installed how did you adhere the ditra matting to the ply? did you flat the ditra matting off with rapid set then allow this to dry then tile ?or did you tile straght on to the ditra matting with rapid set? what size notched trowel did you use ?