I started this job today. Took me 4 hours to sand off the emulson, wipe off the dirt and seal with acrylic paste. Off home for a shower & lunch, then back to mark out both rooms.
Heres the problem. One room is fine for ending cuts by a door if the original tiler made errors setting out as the tiles are large.
The second room is a pain. 300 x 180 slips, which I must say are lovely coloured. BUT, the tiler worked off the shower tray and the lines don't meet up on the two unfinished walls which I'm doing, out by 5-7mm. So, do I cut that into the shortest wall, which happens to be the wall you see as you enter the room, or the wall opposite but is longer as the other wall when entering has work surfaces, hope that makes sense!
Or do I 'bend' the tiles to match, BUT I have a window to deal with...........I'm confused now.......doh.............help.
Oh, and the 15 year old son asked why I was using mason nails to prop up the tiles and not a batten....................I hate Japanese students......lol