Yes,I'm not allowed to show pics of the build yet,but when the program is aired in November I will have to post the picture of six of us tilers crammed into a 2.5 x 2.2 m2 wet room this afternoon laying on 24 m2 of metros in 5 hours !!!!!
I have to install a kitchen floor tommorow for my own customer (happens to be five mins from build)then gonna head on back to help finish off whatever left.
We need to be out of there tommorow night!!!