Hi guys thanx for all past hints and tips. Think ill make a living yet.
Went to quote for a bathroom floor and walls last week and advised that existing tiles on floor would have to come up first. 2 days later customer phones back and says he cant get old adhesive off floor. I went around and old adhesive is about 2 cm thick on ply. I advised he get old ply off floor and replace with new ply. He asked me to tile straight over old adhesive i infromed him i wouldnt tile over old adhesive. It had been down about 11 years and was well stuck. It would of made a bad (worse than it already is) job of the floor. Should i off tiled on to old stuff or was i correct in advising him to put new ply down. Also any tips on running tiles up a bath.
Went to quote for a bathroom floor and walls last week and advised that existing tiles on floor would have to come up first. 2 days later customer phones back and says he cant get old adhesive off floor. I went around and old adhesive is about 2 cm thick on ply. I advised he get old ply off floor and replace with new ply. He asked me to tile straight over old adhesive i infromed him i wouldnt tile over old adhesive. It had been down about 11 years and was well stuck. It would of made a bad (worse than it already is) job of the floor. Should i off tiled on to old stuff or was i correct in advising him to put new ply down. Also any tips on running tiles up a bath.