F
fro0tylo0py
Hi,
I want to retile one of my rooms, but first I need to raise the floor with 50mm unbonded screed. The room is a bit damp, hence why I believe there is no DPM present so wish to install my own before raising the floor ready for tiling so my question is:
I'm a bit stuck for time with other jobs on, so can I lay the DPM over existing tiles, then lay my screed and then lay new tiles? Will the DPM over existing tiles just cause further problems such as condensation? I could remove the tiles first but will take me days as they are firmly stuck down and the concrete underneath could possibly pierce the DPM which i why i thought it would be better to lay the DPM over the smooth tiles.
Please advise. Many thanks.
I want to retile one of my rooms, but first I need to raise the floor with 50mm unbonded screed. The room is a bit damp, hence why I believe there is no DPM present so wish to install my own before raising the floor ready for tiling so my question is:
I'm a bit stuck for time with other jobs on, so can I lay the DPM over existing tiles, then lay my screed and then lay new tiles? Will the DPM over existing tiles just cause further problems such as condensation? I could remove the tiles first but will take me days as they are firmly stuck down and the concrete underneath could possibly pierce the DPM which i why i thought it would be better to lay the DPM over the smooth tiles.
Please advise. Many thanks.