Rich Midge
I've been asked to level the cellar floor of a bar. I intend to use an epoxy DPM over the leveller. Does anyone know if the leveller should be allowed extra drying time before applying the DPM? My gut says to leave it a few days but presumably if a leveller can be overlaid with a vinyl or other impervious surfaces after x amount of hours then it will take the DPM.