Discuss drying time for dry screed in the Australia Tiling Forum area at TilersForums.com.

Reply to drying time for dry screed in the Australia Tiling Forum area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

L
Hi guys, I've just installed Weberfloor flex in a small area 1m2 @35-40mm depth in one pour...
Replies
0
Views
847
leoder
L
Hi, I've laid an external porcelain patio on a sand and cement bed with ultrascape priming...
Replies
3
Views
440
Hi guys, I've had a bit of an issue on a job I've been doing recently. We finished tiling on...
Replies
8
Views
3K
Hi, Just wondering what the general consensus is with grout for a shower. I have epoxy grouted...
Replies
0
Views
814
Hi all , it’s been years since last posted for advice and your methods . My question is this ...
Replies
5
Views
924

Advertisement

Thread starter

Joined

Thread Information

Title
drying time for dry screed
Prefix
N/A
Forum
Australia Tiling Forum
Start date
Last reply date
Replies
1

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 6.1%
  • Kerakoll

    Votes: 14 9.5%
  • Ardex

    Votes: 11 7.4%
  • Mapei

    Votes: 44 29.7%
  • Ultra Tile

    Votes: 17 11.5%
  • BAL

    Votes: 35 23.6%
  • Wedi

    Votes: 3 2.0%
  • Benfer

    Votes: 2 1.4%
  • Tilemaster

    Votes: 21 14.2%
  • Weber

    Votes: 18 12.2%
  • Other (any other brand not listed)

    Votes: 15 10.1%
  • Nicobond

    Votes: 7 4.7%
  • Norcros

    Votes: 3 2.0%
  • Kelmore

    Votes: 4 2.7%
Top