W
wayfoward
Hi, got a job coming up next week of tiling on a rapid set concrete floor with a pipe based under floor heating system fitted. Large format 600 x 900 x 20 natural stone tiles are being laid on top. Been told by the builder the concrete is being laid on the piping this Friday and I should be able to tile on it the following Monday. This seems too soon to me, especially in this colder weather. It's in a new extension and totals approx 80m squared. No heating till the UFH can be fired up. I'm worried about possible shrinkage problems if I tile on it too soon. Also not sure about possibility of decoupling / using ditra mat over a heating system.
Advice required about how long before starting tiling and should I advise builder they should put a large de humidifier in the room, cheers.