T
tomo13
Hi, I have a wet room floor to tile with some of the pebbles on sheets. It has been tanked with Impey membrane, then UFH, then SLC to cover cables. Am I right in thinking best practice now would be to lay some Dural CI++before the pebbles. Thanks for any replies.