A new ufh screed is going to be laid in an extension. The existing flooring is a floating floor with plenty of 'bounce'. Customer would like both floors tiled. Old floor is approx 70m2 and the new screed is approx 30m2.
Is it possible to do this as I don't think cost is an issue?