J
Jimbobble
Conflicting advice on floor job from 2 sources.
Movement joints required around perimitier of floor on concrete. Total field is less than 4m sq
or......
Leave gap round edges the width of the tile depth (6-10mm)
& where to get corner jointing from?
Advice please thanks
Movement joints required around perimitier of floor on concrete. Total field is less than 4m sq
or......
Leave gap round edges the width of the tile depth (6-10mm)
& where to get corner jointing from?
Advice please thanks