i've laid 12mm plywood over chipboard for wetroom floor:
1. do i need to fill the expansion gaps between boards with anything before applying adhesive for tanking membrane?
2. i have mapei primer, what ratio shall i use for priming the floor/plasterboard walls?
3. if i decide to get non-shower wall skimmed should i do so before bringing tanking membrane from floor up 75mm onto bottom of wall?
4. whats the best method of cutting out floor area for former? circular saw (with the guard removed) or floorboard saw?
1. do i need to fill the expansion gaps between boards with anything before applying adhesive for tanking membrane?
2. i have mapei primer, what ratio shall i use for priming the floor/plasterboard walls?
3. if i decide to get non-shower wall skimmed should i do so before bringing tanking membrane from floor up 75mm onto bottom of wall?
4. whats the best method of cutting out floor area for former? circular saw (with the guard removed) or floorboard saw?