Hopefully someone can help!
Currently attempting to gut and refit a small bathroom with plasterboard walls. walls.. First time ive done it, never really plumbed or tiled but learning fast! The gutting went OK and bathroom now empty. but now confusion starts.
The long wall of the bath I was going to fit backer boards mainly for a smooth tiling surface on the biggest wall. Originally was going to repair but thought best to fit the boards. Shower is over bath, so shower wall and end of bath wall I was going to tank with mapei. There is no room for more backer boards on those sides the bathroom is literally 1700mm long and any extra mm will cause a problem.
The tiles came off mostly ok but some plaster has come off the other walls with the adhesive. Does this need to be repaired/replastered? For the bigger damaged areas how would I repair those? And what next to provide sufficient surface for tiling?
Can I bond coat the damaged areas and then use a primer before tiling?
Hope some of this makes sense!
Currently attempting to gut and refit a small bathroom with plasterboard walls. walls.. First time ive done it, never really plumbed or tiled but learning fast! The gutting went OK and bathroom now empty. but now confusion starts.
The long wall of the bath I was going to fit backer boards mainly for a smooth tiling surface on the biggest wall. Originally was going to repair but thought best to fit the boards. Shower is over bath, so shower wall and end of bath wall I was going to tank with mapei. There is no room for more backer boards on those sides the bathroom is literally 1700mm long and any extra mm will cause a problem.
The tiles came off mostly ok but some plaster has come off the other walls with the adhesive. Does this need to be repaired/replastered? For the bigger damaged areas how would I repair those? And what next to provide sufficient surface for tiling?
Can I bond coat the damaged areas and then use a primer before tiling?
Hope some of this makes sense!