B
boldydave
i`ve got my first biggish job(28sq m) coming up to start this weekend and just wanted to run through what i`m going to do/use with you all.it`s a bathroom which has been boarded with green plasterboard all round,except the shower area which has been cement boarded.tiles are ceramic 31cm by 45cm.i was going to tape all the joints with normal plasterboard tape but was unsure what to use on the joints and the corner on the cement board.i`ve just got my trade account sorted so was going to tile giant and use adesilex p9 for all the walls,and mapai ultracolour plus grout.2mm spacers.there is 1 small area which is plastered and i was guessing some sbr primer for that bit. another couple of qustions about how you work.do you tend to lay all your full tiles first,then go back and do all your cuts at the end? also,when laying your top line of tiles at the ceiling and if the ceiling is unlevel do you cut all your tiles the same size and fill the gap with filler(mastic or painters mate) or do you try to cut the tiles to fit the gap exactly? thanks very much for all your help. what a top site! cheers dave.