Got the chance of a fairly large job coming up and seeking a bit of general guidance. Never organised anything on the scale before so just wanting to make sure I'll not get my fingers burnt.
38 bathrooms in one floor of a hotel renovation. First floor was already done, but they weren't overly impressed with the tiling/tilers. I was doing a bit of snagging for them when the other tilers never came back so all being well got my foot in the door. Around 15m per bathroom, should be able to be done in about a day and a half tiled and grouted. There's a month turnover from start of the tiling to finish all 38, and I'd be able to get two other tilers to help me, and most likely a third if I was stuck.
Can't foresee any major problems liable to arise, reputable firm of which I've worked on their jobs before so I know how they operate. Is there anything I must look into first or sort out or even general tips for taking on a big (for me) job like this? My main concern would be penalties if the job was not completed on time.
38 bathrooms in one floor of a hotel renovation. First floor was already done, but they weren't overly impressed with the tiling/tilers. I was doing a bit of snagging for them when the other tilers never came back so all being well got my foot in the door. Around 15m per bathroom, should be able to be done in about a day and a half tiled and grouted. There's a month turnover from start of the tiling to finish all 38, and I'd be able to get two other tilers to help me, and most likely a third if I was stuck.
Can't foresee any major problems liable to arise, reputable firm of which I've worked on their jobs before so I know how they operate. Is there anything I must look into first or sort out or even general tips for taking on a big (for me) job like this? My main concern would be penalties if the job was not completed on time.