C
cornish_crofter
Leave about 15 to 20mm clearence around the former when bedding down.
This enables you to twist/move the former slightly to help bed it in. Having it tight to the wall/screed rather limits your options.
This gap can be backfilled with adhesive or screed.
This enables you to twist/move the former slightly to help bed it in. Having it tight to the wall/screed rather limits your options.
This gap can be backfilled with adhesive or screed.