i have a customer wanting 1.6m2 of slate laying when i went to look at the job i lifted the old lino in the room and discovered that the sub wasmouldy and appeared to be rotten now the sub is 18mm chipb'd (floating) on top of 2" polestyrene ontop off dpm and concrete.
I wanted to cut out the damaged chipb'd, fasten some 4"by 2" to the dpm and conctrete then fasten 18mm ply to that and tile striaght on top thus redusing the step into the room.
But the building contractor has said there is nowt wrong with the chipb'd and to use some type of fungicide remover to get rid of the mould.
My question is shall i overlay with ply and will screwing it into the chipb'd be ok or i thought i could overlay with ditra i am gonna phone schluter as well just wanted to know if anyone can offer any advice.
Also i dont think the existing chipb'd is of p5 grade (water resistant)(green stuff)
Cheers.
I wanted to cut out the damaged chipb'd, fasten some 4"by 2" to the dpm and conctrete then fasten 18mm ply to that and tile striaght on top thus redusing the step into the room.
But the building contractor has said there is nowt wrong with the chipb'd and to use some type of fungicide remover to get rid of the mould.
My question is shall i overlay with ply and will screwing it into the chipb'd be ok or i thought i could overlay with ditra i am gonna phone schluter as well just wanted to know if anyone can offer any advice.
Also i dont think the existing chipb'd is of p5 grade (water resistant)(green stuff)
Cheers.