Search the forum,

Discuss sub floor prep in the America Tile Forum area at TilersForums.com.

Reaction score
0
Points
36
Location
swindon
Hi All First post

long storey short had arranged for someone to re model my bathroom on the 1st floor with a wet room but disaster hit on day 3
after coming back from work i found a large amount of problems
floor replaced with loft board and screwed down with plaster board screws
waste went from 40mm to 32mm and was covered in silicon (it was also glued) apart from 1 elbow that was missed and not even glued
a strap boss was used lower down the stack and was not glued but silicone used
so pulled him off the job as it was clear he didn't know what he was doing
so i have decided to overlook the job myself replying of people of the trade i need i know a few people that is also helping me out

the wet room has now been scrapped and a 25mm low profile mira tray is to be used
a plumber i used for a new boiler recently helped me out and corrected the bodge this person did and is coming back when ready to pre fit the other stuff once floor is complete just before tiler comes out
so i have laid with my friend thats a chippy new 18mm green chipboard and have 6mm no more ply to go over the top and but up with the tray that will sit on the 18mm chipboard
so my questions are
1- after fitting the 6mm no more ply staggered with the recommended glue and screws do i need to coat the no more ply in a waterproof barrier? and is tanking the floor area near the tray also worth doing? any recommendations on products to use
2- we are also putting a studded wall in the shower area approx. 80/100mm out for recessed shelf using 12mm hardieboard i have the hardie tape and screws but wasnt sure what adessive to use for filling joints then taping and over filling again as per videos i have seen again recommendations very grateful
i have the mapie shower kit to tank the walls after this is done

once this is complete i have a friend that's a tiler just hoping he has the time to get to me as he is always busy :) but he has said he know a few tilers in Swindon that can help me if it comes to it

sorry for such a long winded first post

Baz
 

Reply to sub floor prep in the America Tile Forum area at TilersForums.com

There are similar tiling threads here

    • Like
A little help guys. I've been asked to price 71sqm of limestone flooring. My issue is this...
Replies
2
Views
236
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
525
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
908
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
666

Advertisement

New Tiling Questions

Replies you've not seen

Top