I’m planning on tiling a kitchen floor in an older property that has had previous modifications.
After removing some stud partition walls to create a square space I have two separate sections of floor which will require preparation. One section (2m2) is a concrete slab about 40mm lower than the other section which consists of thick travertine tile (7m2).
I appreciate it’s not best practice but I’m leaving the tile in situ. They are well bonded and I want to minimise the work.
Originally I had planned to prep the floor with SBR and pour SLC over the entire floor, then add a Ditra membrane before tiling.
Using this method I would expect to use around 50mm of SLC over the lower portion of the floor and 10mm over the remainder.
I’d like to look at other options to reduce the cost and effort of the SLC and considered a cement dry pack. I’ve never used this before and I’m not sure about drying times for the Ditra mat and tiling.

Given the low cost and ease of application it would be my preferred choice to make up the 40mm height difference but would appreciate advice regarding drying times for tiling.

TIA
 
You could stick down 40mm tile backerboards with tile adhesive to the concrete slab, much quicker maybe cheaper and then ditra.
Search on eBay for the boards.
 

Advertisement

Thread statistics

Created
Rankbajin,
Last reply from
Phone-a-tiler,
Replies
2
Views
2,587

Weekly Email Digest

Back
Top

Click Here to Register for Free / Remove Ad