S
Sandy737
Floor tiling directly onto retrofit wet UFH overboard.
Eg. Cellecta HiDeck 18, Polypipe Overlay, WundaTrade EPS 400
They are designed to go onto existing concrete and can take stone tiles without any screed, or so they claim.
Anyone had experience of floor tiling directly onto these type of boards.
Particularly interested to hear if anyone has any personal experience.
Thanks
Eg. Cellecta HiDeck 18, Polypipe Overlay, WundaTrade EPS 400
They are designed to go onto existing concrete and can take stone tiles without any screed, or so they claim.
Anyone had experience of floor tiling directly onto these type of boards.
Particularly interested to hear if anyone has any personal experience.
Thanks
Last edited by a moderator: