3 small floors, with UFH cables laid yesterday.
Self levelled this morning
Just sitting here.........and just realised, that I missed one of the probes. :yikes:
Either scrape out enough self level and then fit.
Or place on top of self levelling compound and tile. Obviously not the best reading.
All these floors are no more than 1metre.
Oh the joys of tiling.
Self levelled this morning
Just sitting here.........and just realised, that I missed one of the probes. :yikes:
Either scrape out enough self level and then fit.
Or place on top of self levelling compound and tile. Obviously not the best reading.
All these floors are no more than 1metre.
Oh the joys of tiling.