L & R CERAMICS
i have been to qoute for a hospice and after having a nosey this is what it entails:
there are 18 bathrooms approx 24 m2 of tiling 6*6 whites
in every room there is boxing in to build approx 1mtr high by 1mtr wiide 13inch from wall
9 raised disabled level access shower trays ,9 underfloor trays(the floor will need cutting to install these)
18 levered thermostatic shower controls in chrome
approx 108 sq mtr of viynl safety flooring to fit ,with cove up wall
18 dock packs (fold down safety handles in shower areas)
18 toilet and sinks to replace but in original position so not much plumbing
18 ceilings to paint also doors
18 folding shower doors half height
ive got a price for an electrician to insall new fans and new pull cords
18 rooms to rip out before we start
then a load of skips which ill probably just get when needed as we go,i wreckon 1 big skip per room £89 quid a go
what i want from you guys is a few prices to fit all the above and how you worked it out ,i have a price for the whole job but want to make sure i have it right ,obviously you cant fit it all i will need other trades to help i.e flooring approx £300 notes per room including materials
come on then brains
there are 18 bathrooms approx 24 m2 of tiling 6*6 whites
in every room there is boxing in to build approx 1mtr high by 1mtr wiide 13inch from wall
9 raised disabled level access shower trays ,9 underfloor trays(the floor will need cutting to install these)
18 levered thermostatic shower controls in chrome
approx 108 sq mtr of viynl safety flooring to fit ,with cove up wall
18 dock packs (fold down safety handles in shower areas)
18 toilet and sinks to replace but in original position so not much plumbing
18 ceilings to paint also doors
18 folding shower doors half height
ive got a price for an electrician to insall new fans and new pull cords
18 rooms to rip out before we start
then a load of skips which ill probably just get when needed as we go,i wreckon 1 big skip per room £89 quid a go
what i want from you guys is a few prices to fit all the above and how you worked it out ,i have a price for the whole job but want to make sure i have it right ,obviously you cant fit it all i will need other trades to help i.e flooring approx £300 notes per room including materials
come on then brains